CountyOK
Posted
Nov 3, 2026
Dec 14, 2026
Bridge Materials RFP
Supply of bridge materials.
Description: The County of Wayne, NY is soliciting sealed responses for Timber Bridge Materials, Timber Culvert Materials, Timber Salt Storage Building Materials. Responses are due, on or before 10:00 am prevailing time on Wednesday, January 6, 2027. Late responses will not be accepted.
County · NY, US
Adjacent opportunities open for bidding right now.
CountyOK
Posted
Nov 3, 2026
Dec 14, 2026
Supply of bridge materials.
CityPA
Posted
Nov 12, 2026
Dec 9, 2026
It is the intent of the City of Philadelphia to make an award for Building Materials in accordance with Section 2 of this Invitation and Bid. All quotes must be submitted through PHLContracts no later than 10:30 AM on the date that the related bid opens. Quotes will not be accepted after the bid opening. It is the Seller's responsibility to ensure that the quote is submitted in a timely manner. 30515 000 001 Patch, Black Top; 60 lb. Bag. Per paragraph 2.8.1.1 of attached bid document. 30515 000 007 Joint, Filler, Expansion, Preformed; Paving and Structural Concrete Construction Non Extruding And Resilient, Bituminous Type; Formed of Cellular Strips, Bound and Saturated With Bituminous Binder, Encased Between 2 Layers of Bituminous Saturated Felt; Per ASTM D1751-18 Or Latest Revision. 10 Ft. Long, 1/2" Thick X 4" Width. Per paragraph 2.8.1.2 of attached bid document. 30515 000 009 Joint Compound, All Purpose, Ready Mix, 5 Gallon Pail. Per paragraph 2.8.1.3 of attached bid document. 30515 000 010 Tape, Joint, Wallboard, 350 ft. Per Roll. Per paragraph 2.8.1.4 of attached bid document. 30515 000 011 Tape, Joint, Wallboard, Self-Stick, 300 ft. per roll. Per paragraph 2.8.1.5 of attached bid document.
Wisconsin Department of Natural Resources
State AgencyWI
Posted
Nov 9, 2026
Dec 3, 2026
Timber stumpage on state-owned land and school forest. There are 5 timber sale tracts of stumpage for sale on state managed lands and school forest covering 263 AC.
Medford Area Public School District
School DistrictWI
Posted
Nov 10, 2026
Dec 3, 2026
Timber Stumpage. Sale consists of mixed hardwood: 78 MBF and 1,750 Tons; basswood: 3 MBF and 30 Tons.
Decision makers connected to this RFP from Wayne County.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
211 days before RFP
The Board of Supervisors adopted preliminary-engineering authorization for the funded replacement of the Leach Road bridge in Lyons.
RESOLUTION 237-26: AUTHORIZATION TO ENTER INTO AGREEMENT WITH COLLIERS ENGINEERING AND DESIGN FOR THE PRELIMINARY ENGINEERING PHASE OF THE LEACH ROAD BRIDGE PROJECT Mr. Brady presented the following: WHEREAS, Wayne County has been awarded funds for the design of the Leach Road bridge replacement project in the Town of Lyons, (P.I.N. 4WA0.08), and WHEREAS,…
Wayne County Board Of Supervisors Regular Meeting
Board meeting · Apr 21, 2026
Board meeting
196 days before RFP
The capital-plan table lists a Joy Road bridge superstructure replacement and a Ridge Road culvert project with stated funding amounts and years.
Non-Local Local Dept Capital Improvement/Purchase Location Funding Cost Priority 2027 2028 2029 2030 2031 Ridge Road Alton Hamlet Mill & Repave Sodus $125,000 1 $125,000 South Main Street Marion Hamlet (Mill St to NYS 21) Marion $800,000 2 $800,000 Mill & Fill West Walworth & Walworth Hamlets Walworth $400,000 3 $400,000 Walworth Road Mill & Repave (Eddy Rd…
Public Works Committee Regular Meeting
Board meeting · May 6, 2026
Board meeting
133 days before RFP
Wayne County Public Works reported that NYSDOT had committed 15% funding for the Leach Road Bridge project.
Public Works Mr. Rooney and Mr. Kolczynski presented the following transmittals: --Authorization to Sign Agreement with E2Companies LLC for Microgrid Preliminary Project Engineering Study. Approved 5-0. --Authorization to Sign Lease Agreement with Verizon Wireless. Approved 5-0. --Authorization to Rescind Resolution 285-26 Relating to Generator Maintenance…
Board meeting
29 days before RFP
The Wayne County Board of Supervisors approved the Joy Road Bridge replacement project and appropriated $112,700 for its advancement, with construction required to begin within 24 months after award and finish within 30 months.
RESOLUTION 533-26: AUTHORIZATION TO SIGN SUPPLEMENTAL AGREEMENT WITH NYSDOT FOR THE JOY ROAD BRIDGE PROJECT Mr. Brady presented the following: WHEREAS, a project for the replacement of the Joy Road Bridge, P.I.N. 4BNY81 (the Project") is eligible for funding under Title 23 U.S. Code, as amended, that calls for the apportionment of the costs such program to…
RFP published
Proposals due (45 days left)
Public Works Committee Minutes
Board meeting · Jul 8, 2026
Wayne County Board of Supervisors Regular Meeting
Board meeting · Oct 20, 2026