Open RFP

The Hub on Smith Upward Project Phase V - Site Improvements

Description: Work generally includes demolition of existing pavement, sidewalks, curbs, stairs, ramps, retaining walls, railings, equipment enclosures, landscaping, utilities, and selected exterior wall materials; construction of new concrete parking lots, access drives, sidewalks, curb and gutter, accessible parking areas, raised crosswalks, equipment pads, stairs, and related site features; grading, storm drainage, water, sanitary sewer, grease interceptor, electrical, site-lighting, landscaping, irrigation, signage, and pavement-marking improvements; and phased construction necessary to maintain access and facility operations. Exterior building work includes removal and replacement of selected brick veneer, metal siding, insulation, weather barriers, flashing, and trim; foundation-wall waterproofing and drainage-mat installation; removal and reinstallation of storefront windows, coping, artwork, signage, and interior window finishes; repairs and insulation at existing wall and floor framing; and construction of concrete mechanical pads with an aluminum screen wall and gates.

Buyer
City of Sheridan

City · WY, US

Released
Sep 22, 2026
Closes
Oct 27, 2026(18 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts