Groveland Correctional Facility
Fire DepartmentNY
Posted
Aug 12, 2026
Dec 9, 2026
Arc Flash
Provide an Arc flash hazard study for the electrical distribution system. The intent of the Arc flash hazard study is to determine hazards that exist at each major piece of electrical equipment. This includes, but not limited to switchgear, switchboards, panelboards, motor control centers, PDUs, UPS, ATSs, and transformers. Contract term: 1 year.
