Retrieving RFP details
Release
Close
Port Of Grays Harbor
Perform approx. 40,000' rail construction to accommodate unit trains and railcar storage, repurpose a 50-acre former casting basin site into a breakbulk cargo handling and laydown area, access and roadway improvements, and site improvements. Work includes: Demolition, mass earthwork, site preparation, retaining wall construction, culverting, subsurface utility work, storm drainage improvements, paving, rail construction, lighting, fencing, and new guard station includes 6,148 LF track subdrain - 8" perf, 430 LF 12" ductile iron pipe, 480 LF 18" concrete pipe class V, 3,525 LF storm sewer testing, 1 EA distribution power pole relocation, 949 LF 12" steel casing pipe, 14 LF water 6" DI pipe, 301 LF water 6" PVC pipe, 768 LF sanitary sewer pipe RCP 27", 2 EA sanitary sewer type 2 manhole 54".
Port Of Corpus Christi Authority
Work generally includes grading and expansion of a 14-acre site, construction of a new access road, relocation of electrical utilities, and installation of a new electrical duct bank and pad. Additional work includes landfill fencing, rehabilitation of existing concrete roadway, clearing of approximately 3 acres for roadway excavation, and construction of a 10" continuously reinforced concrete roadway with reconstruction of the CB-4 Rail Unloading Pad.
City of Hialeah
Seeking a construction manager at risk (CMAR) to lead the educational academy - phase 4 expansion.
City of San Antonio
Provide construction manager at risk - terminal A/B reconfiguration and rehabilitation at international airport. This includes improvements to hold rooms, restrooms, terminal finishes, and other key areas as well as a new passenger air side circulation corridor to connect Terminals A and B. Terminal B will receive targeted upgrades focused on Furniture, Fixtures, and Equipment (FF&E), terminal finishes, curtain wall repairs, and Americans with Disabilities (ADA) upgrades.
Atlantic Aviation
Construction of one new aircraft storage hangar with associated lean-to workshop/offices, one new FBO terminal, landside parking development, airside ramp expansion, and associated grading and drainage improvements. See outside link.
Release
Sep 30, 2024
Close
Oct 25, 2024