Terminal Apron Stormwater Pipe Lining, Fy26
Aug 4, 2026
Closes
Aug 20, 2026
Project consists of geopolymer mortar lining of the 72" rcp "american" stormwater line (approx 1,600 LF). Project scope also includes geopolymer lining of all manhole/catch basin structures within the "american" line footprint.
