Aug 13, 2026
Closes
Aug 21, 2026
Asphalt Overlay Project RFP
Provide asphalt overlay project on approx. 1.7 miles. The project generally includes, but is not limited to: approx. 1. 5-inch asphalt overlay; a skim coat (level-up) between the centerline and fog line in both the eastbound and westbound lanes, approx. one-half (½) inch thick; asphalt quantities based upon kdot calculations of 145 pounds per cubic foot; approx. project dimensions: 4,900 feet × 26 feet; 2,300 feet × 30 feet; and 2,300 feet × 26 feet; furnishing all required pilot car and flagging operations.