Special DistrictVA
Posted
Sep 26, 2026
Nov 9, 2026
Construct a Second Industrial Access Road (Request for Proposal)
DESIGN-BUILD. Construct a second industrial access road of approx 2,300 LF.
Description: Priority 1 expectation is to fine grade, install additional drainage structures, and pave approx. 1,800 LF of existing gravel access road to CMC Steel this fall before asphalt plants close. This section also includes a rail crossing and truck turn around area. Priority 2 will be the realignment and widening of approx. 1,300 LF of to relocate the existing entrance, add turn lanes to U.S. 11, and a construct approx. 600 linear of new access road and a new intersection to the new CMC Steel plant. The new entrance location will require utility relocations of 800 LF of 12" and 1,250 LF of 30" ductile iron water line and 210 linear feet of 8-inch SDR-35 sewer line in the road area.
SpecialDistrict · WV, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictVA
Posted
Sep 26, 2026
Nov 9, 2026
DESIGN-BUILD. Construct a second industrial access road of approx 2,300 LF.
CityMS
Posted
Sep 25, 2026
Oct 27, 2026
Work consist essentially of construction of two-lane paved roadway and bridge.
CityVA
Posted
-
Oct 8, 2026
Work includes mobilization and site access improvements; clearing, grubbing, and grading of the access road corridor; construction of new drainage piping; construction of new drive approach, curb and gutter, and paving; installation and maintenance of erosion and sediment control measures; installation of rock dissipaters, seeding, and final stabilization.
Hawaii Department of Corrections and Rehabilitation
State AgencyHI
Posted
Sep 21, 2026
Oct 30, 2026
Constructing a new access road at the Women's Community Correctional Center (WCCC), including site grading, drainage improvements, asphalt pavement, fencing, and installation of empty conduit for the future sallyport gate and future kitchen.