Raw Sewage Pump Replacement Project Contract Nos. 2026-07A & 2026-07B RFP
Rostraver Township seeks sealed bids to replace the existing raw sewage pumps, piping, and valves at its wastewater treatment plant. The work is divided into Contract No. 2026-07A for General/Mechanical Construction and Contract No. 2026-07B for Electrical Construction, and has an expected duration of 365 days. Bids must be submitted electronically through PennBid by October 29, 2026, at 10:00 a.m. local time, and the project includes prevailing-wage, non-discrimination, employee-verification, and U.S.-made steel requirements.