Special DistrictTX
Aug 17, 2026
Closes
Oct 14, 2026
Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam
The Brazos River Authority is seeking qualified engineering firms for Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam. The work includes assessing the hydrostatic pressure relief system, stilling basin concrete, downstream river channel, and river banks, with potential design and construction oversight for remedial improvements. This is a professional-services RFP, not a grant program, and responses are due October 14, 2026, at 10:00 AM Central Time.