Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a statewide contract for Electrical, HVAC, Plumbing, Boiler, and Chiller Systems Maintenance & Repair services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Posted Date
Dec 1, 2025
Due Date
Jan 16, 2026
Release: Dec 1, 2025
Close: Jan 16, 2026
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
AvailableProvide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
Posted Date
Nov 12, 2025
Due Date
Jan 14, 2026
Release: Nov 12, 2025
Close: Jan 14, 2026
Provide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
AvailableReplace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
Posted Date
Nov 5, 2025
Due Date
Jan 26, 2026
Release: Nov 5, 2025
Close: Jan 26, 2026
Replace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
AvailableProvide HVAC systems and boiler equipment and supplies on a as needed basis.
Posted Date
Dec 24, 2025
Due Date
Jan 2, 2026
Release: Dec 24, 2025
Close: Jan 2, 2026
Provide HVAC systems and boiler equipment and supplies on a as needed basis.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis