Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
HVAC upgrades and boiler replacement at middle school
Posted Date
Nov 11, 2025
Due Date
Jan 14, 2026
Release: Nov 11, 2025
Close: Jan 14, 2026
HVAC upgrades and boiler replacement at middle school
AvailableHeadquarters office building HVAC system upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Headquarters office building HVAC system upgrades.
AvailableWork includes removal of current water-cooled chiller, pumps, and cooling tower and installation of new air-cooled chiller and pumps along with lines for a temporary chiller in case the primary chiller is non-functional. An air-cooled chiller has been purchased by the city under a separate contract. All other materials are to be furnished by the contractor.
Posted Date
Oct 28, 2025
Due Date
Dec 16, 2025
Release: Oct 28, 2025
Close: Dec 16, 2025
Work includes removal of current water-cooled chiller, pumps, and cooling tower and installation of new air-cooled chiller and pumps along with lines for a temporary chiller in case the primary chiller is non-functional. An air-cooled chiller has been purchased by the city under a separate contract. All other materials are to be furnished by the contractor.
Provide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Provide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis