Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Road reconstruction - 2 lane.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes but is not limited to 13,033 CY of unclassified excavation, 8,463 SY of road reconstruction including geotextiles, crushed base, and asphalt, ditch reconstruction, fencing, striping, RCP culverts, signage, reclamation including seeding, and traffic control.
Posted Date
Dec 27, 2025
Due Date
Jan 28, 2026
Release: Dec 27, 2025
Close: Jan 28, 2026
Project includes but is not limited to 13,033 CY of unclassified excavation, 8,463 SY of road reconstruction including geotextiles, crushed base, and asphalt, ditch reconstruction, fencing, striping, RCP culverts, signage, reclamation including seeding, and traffic control.
AvailableRoad reconstruction project 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Road reconstruction project 2026.
AvailableWork consist of construction documents for approx. 7,000 LF of 2-lane asphalt roadway reconstruction (full-depth). Proposed pavement section will be 2" type d hmac, 4" type b hmac, over 6" pulverized and mixed existing road material. The design of these improvements includes full depth reconstruction of the existing pavement to generally match the existing pavement width. Drainage improvements will be limited to removal and replacement of existing culverts, design will also include signing, pavement markings, seeding disturbed areas, traffic control narrative, minor adjustments to existing city utilities, and erosion control.
Posted Date
Jan 2, 2026
Due Date
Jan 22, 2026
Release: Jan 2, 2026
Close: Jan 22, 2026
Work consist of construction documents for approx. 7,000 LF of 2-lane asphalt roadway reconstruction (full-depth). Proposed pavement section will be 2" type d hmac, 4" type b hmac, over 6" pulverized and mixed existing road material. The design of these improvements includes full depth reconstruction of the existing pavement to generally match the existing pavement width. Drainage improvements will be limited to removal and replacement of existing culverts, design will also include signing, pavement markings, seeding disturbed areas, traffic control narrative, minor adjustments to existing city utilities, and erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →