Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of construction documents for approx. 7,000 LF of 2-lane asphalt roadway reconstruction (full-depth). Proposed pavement section will be 2" type d hmac, 4" type b hmac, over 6" pulverized and mixed existing road material. The design of these improvements includes full depth reconstruction of the existing pavement to generally match the existing pavement width. Drainage improvements will be limited to removal and replacement of existing culverts, design will also include signing, pavement markings, seeding disturbed areas, traffic control narrative, minor adjustments to existing city utilities, and erosion control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Road reconstruction project 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Road reconstruction project 2026.
AvailableReconstruction of road. The roadway from this project limit will be milled, paved with two lifts of 1.5" of HMA S0.375, and restriped. This work shall include drainage work, utility work, full depth reclamation, paving, grading, and driveway work. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Reconstruction of road. The roadway from this project limit will be milled, paved with two lifts of 1.5" of HMA S0.375, and restriped. This work shall include drainage work, utility work, full depth reclamation, paving, grading, and driveway work. See attached file.
AvailableProvide labor, equipment, materials, tools, transportation, and incidentals necessary to repair and upgrade the forest road.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Provide labor, equipment, materials, tools, transportation, and incidentals necessary to repair and upgrade the forest road.
Retaining wall replacement and road reconstruction.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Retaining wall replacement and road reconstruction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis