Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Minnesota Department of Natural Resources (DNR) is soliciting bids for repair and upgrade of Bronk Forest Road within the Bronk Forest Management Unit in Winona County, including labor, equipment, materials, transportation, and all incidentals required to complete the work according to specifications. The contractor must complete the work by 2026-06-30, comply with Minnesota prevailing wage statutes, and provide required proof of insurance. The estimated project budget is approximately $500,000$2,000,000 and bidders must provide a total price to complete the specified work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Minnesota Department of Natural Resources issued an RFB for Tower Area Road Grading seeking contractors to perform road grading and related site work for DNR-managed property near Tower, MN. The opportunity was posted on 2025-12-23 and, per the listing, closes in early January 2026; vendors are expected to submit responses through the state's procurement/bid portal indicated in the posting. This is a competitive construction bid (not a grant) for road grading services; bidders should obtain the full specifications and submission instructions from the official Bonfire posting at the URL above.
Posted Date
Dec 23, 2025
Due Date
Jan 9, 2026
Release: Dec 23, 2025
Close: Jan 9, 2026
The Minnesota Department of Natural Resources issued an RFB for Tower Area Road Grading seeking contractors to perform road grading and related site work for DNR-managed property near Tower, MN. The opportunity was posted on 2025-12-23 and, per the listing, closes in early January 2026; vendors are expected to submit responses through the state's procurement/bid portal indicated in the posting. This is a competitive construction bid (not a grant) for road grading services; bidders should obtain the full specifications and submission instructions from the official Bonfire posting at the URL above.
AvailablePerform an estimated 60 hours of work on an as-needed basis during the contract term by grinding trees and brush with a crawler-type power shovel (track hoe) fitted with a grinding head in select locations of the Warroad Forestry Areas of Beltrami Island and Lost River State Fperform an estimated 60 hours of work on an as-needed basis during the contract term by grinding trees and brush with a crawler-type power shovel (track hoe) fitted with a grinding head in select locations of the Warroad Forestry Areas of Beltrami Island and Lost River State Forests as specified.
Posted Date
Dec 17, 2025
Due Date
Dec 30, 2025
Release: Dec 17, 2025
Close: Dec 30, 2025
Perform an estimated 60 hours of work on an as-needed basis during the contract term by grinding trees and brush with a crawler-type power shovel (track hoe) fitted with a grinding head in select locations of the Warroad Forestry Areas of Beltrami Island and Lost River State Fperform an estimated 60 hours of work on an as-needed basis during the contract term by grinding trees and brush with a crawler-type power shovel (track hoe) fitted with a grinding head in select locations of the Warroad Forestry Areas of Beltrami Island and Lost River State Forests as specified.
Road reconstruction project 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Road reconstruction project 2026.
AvailableReconstruction of road. The roadway from this project limit will be milled, paved with two lifts of 1.5" of HMA S0.375, and restriped. This work shall include drainage work, utility work, full depth reclamation, paving, grading, and driveway work. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Reconstruction of road. The roadway from this project limit will be milled, paved with two lifts of 1.5" of HMA S0.375, and restriped. This work shall include drainage work, utility work, full depth reclamation, paving, grading, and driveway work. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis