Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes but is not limited to 13,033 CY of unclassified excavation, 8,463 SY of road reconstruction including geotextiles, crushed base, and asphalt, ditch reconstruction, fencing, striping, RCP culverts, signage, reclamation including seeding, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Close: Feb 15, 2026
Road reconstruction - 2 lane.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of full-depth hot-mix asphalt (HMA) roadway reconstruction, new curb and gutter construction, new sidewalk construction, driveways removal and replacement, fire hydrants relocation, new street lighting system, miscellaneous utility structure adjustments.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
The Project consists of full-depth hot-mix asphalt (HMA) roadway reconstruction, new curb and gutter construction, new sidewalk construction, driveways removal and replacement, fire hydrants relocation, new street lighting system, miscellaneous utility structure adjustments.
AvailableReplacement of sanitary sewer manholes, sewer main, sewer laterals, cleanouts, water main, services, curb stops, appurtenances, roadway subbase course, asphalt base and surface courses, curb, sidewalk, gutter and driveways. The work also includes installation of electrical conduit crossings.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Replacement of sanitary sewer manholes, sewer main, sewer laterals, cleanouts, water main, services, curb stops, appurtenances, roadway subbase course, asphalt base and surface courses, curb, sidewalk, gutter and driveways. The work also includes installation of electrical conduit crossings.
AvailableStreet reconstruction.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Street reconstruction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →