Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work generally includes the construction of a 1,056 SF water pumping facility with four vertical turbine pumps, mechanical piping, valves and fittings: the installation of a 24” supply water pipeline and 18” and 6” discharge transmission mains including offsite existing water main connections and valve insertions. The work includes grading, drainage, storm drain, pavement, fencing, landscaping and concrete improvements. The pump house building will be CMU with a standing seam metal roof; includes HVAC equipment and electrical and SCADA systems. The building will have a crane runway, bridge crane and hoist system and other related components and work all as contained in the Contract Documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableWork includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableWork consists of a new stormwater pump station c-14 stormwater pump station.
Posted Date
Nov 16, 2025
Due Date
Jan 8, 2026
Release: Nov 16, 2025
Close: Jan 8, 2026
Work consists of a new stormwater pump station c-14 stormwater pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis