Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Montgomery
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Krum
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
City of Krum
Close: Dec 2, 2025
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of North Lauderdale
Work consists of a new stormwater pump station c-14 stormwater pump station.
Posted Date
Nov 16, 2025
Due Date
Jan 8, 2026
Release: Nov 16, 2025
City of North Lauderdale
Close: Jan 8, 2026
Work consists of a new stormwater pump station c-14 stormwater pump station.
AvailableCity of Stanton
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 10, 2025
Release: Nov 21, 2025
City of Stanton
Close: Dec 10, 2025
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
AvailableArkansas Department of Transportation
The Arkansas Department of Transportation seeks bids for reconfiguring the Highway 5 Interchange and replacing a structure over I-57 in Lonoke County. The project includes clearing, earthwork, concrete paving, traffic signal installation, and drainage improvements.
Posted Date
-
Due Date
Jan 21, 2026
Release: -
Arkansas Department of Transportation
Close: Jan 21, 2026
The Arkansas Department of Transportation seeks bids for reconfiguring the Highway 5 Interchange and replacing a structure over I-57 in Lonoke County. The project includes clearing, earthwork, concrete paving, traffic signal installation, and drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →