Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Sun Valley General Improvement District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Works Director
General Manager
Treasurer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Sun Valley General Improvement District
The work consist of approx 740 LF 15" gravity PVC sanitary sewer pipe; 2 EA 60" precast concrete manholes; 480 LF 21" gravity PVC sanitary sewer pipe; 1 LS bypass pumping; 1 LS roadway repair and site restoration.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Sun Valley General Improvement District
Close: Jan 22, 2026
The work consist of approx 740 LF 15" gravity PVC sanitary sewer pipe; 2 EA 60" precast concrete manholes; 480 LF 21" gravity PVC sanitary sewer pipe; 1 LS bypass pumping; 1 LS roadway repair and site restoration.
AvailableSun Valley General Improvement District
Installation of approx., 60 LF of 6" water main, 320 LF of 8" water main, valves, connection assemblies, a flow control and meter vaults, pavement repair and surface improvement restoration and other related work.
Posted Date
Jun 5, 2025
Due Date
Jul 1, 2025
Release: Jun 5, 2025
Sun Valley General Improvement District
Close: Jul 1, 2025
Installation of approx., 60 LF of 6" water main, 320 LF of 8" water main, valves, connection assemblies, a flow control and meter vaults, pavement repair and surface improvement restoration and other related work.
Sun Valley General Improvement District
The work generally includes the construction of a 1,056 SF water pumping facility with four vertical turbine pumps, mechanical piping, valves and fittings: the installation of a 24” supply water pipeline and 18” and 6” discharge transmission mains including offsite existing water main connections and valve insertions. The work includes grading, drainage, storm drain, pavement, fencing, landscaping and concrete improvements. The pump house building will be CMU with a standing seam metal roof; includes HVAC equipment and electrical and SCADA systems. The building will have a crane runway, bridge crane and hoist system and other related components and work all as contained in the Contract Documents.
Posted Date
Mar 31, 2025
Due Date
Apr 30, 2025
Release: Mar 31, 2025
Sun Valley General Improvement District
Close: Apr 30, 2025
The work generally includes the construction of a 1,056 SF water pumping facility with four vertical turbine pumps, mechanical piping, valves and fittings: the installation of a 24” supply water pipeline and 18” and 6” discharge transmission mains including offsite existing water main connections and valve insertions. The work includes grading, drainage, storm drain, pavement, fencing, landscaping and concrete improvements. The pump house building will be CMU with a standing seam metal roof; includes HVAC equipment and electrical and SCADA systems. The building will have a crane runway, bridge crane and hoist system and other related components and work all as contained in the Contract Documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.