Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
State of Utah DFCM requests bids from Stage II prequalified mechanical contractors for removal and replacement of approximately 450 ft of direct-buried steam and condensate piping with new pre-insulated piping, associated concrete demolition/excavation, replacement of ~10' x 45' flatwork, ~40 sq ft landscaping, and installation of a new isolation valve. Construction budget ~$393,367. Requires Stage II prequalification, mandatory pre-bid attendance, 5% bid bond, and 100% performance/payment bonds per DFCM.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking a vendor for the follow-on steam and condensate line replacement/construction in the heart of URI's campus. The project includes replacing several hundred yards of high-pressure steam and condensate line, moving/replacing/relocating steam vaults, and replacement of main water line connections in several residence halls. See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 14, 2026
Release: Nov 20, 2025
Close: Jan 14, 2026
Seeking a vendor for the follow-on steam and condensate line replacement/construction in the heart of URI's campus. The project includes replacing several hundred yards of high-pressure steam and condensate line, moving/replacing/relocating steam vaults, and replacement of main water line connections in several residence halls. See attached file.
AvailableDESIGN-BUILD. Steam Line Replacements.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Close: Jan 19, 2026
DESIGN-BUILD. Steam Line Replacements.
AvailableReplacement/addition steam mains.
Posted Date
Dec 10, 2025
Due Date
Dec 25, 2025
Release: Dec 10, 2025
Close: Dec 25, 2025
Replacement/addition steam mains.
AvailableThe scope of the project includes the replacement of 607 seats which includes the demo and removal of the old seats, dumpster costs, new materials, including seats and 100 tablet arm writing surfaces, installation and freight.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
The scope of the project includes the replacement of 607 seats which includes the demo and removal of the old seats, dumpster costs, new materials, including seats and 100 tablet arm writing surfaces, installation and freight.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis