Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include remove and dispose of the existing condensate tank, pumps, and associated piping. Disconnect existing condensate tank electric-panel. Install new condensate tank panel. Install a new 3-inch pad for the new condensate tank. Furnish, rig, transport, and set the new condensate tank and pump unit on new pad. Modify and reconnect pump discharge piping to the existing discharge header. Furnish and extend a new vent/overflow line a minimum of 20feet to the approved termination point with proper pitch and supports.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and Install Two Automatic Fuel Tank Gauges.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Furnish and Install Two Automatic Fuel Tank Gauges.
AvailableWork includes, but is not limited to, survey and excavation of existing gas headers to determine invert elevation and dimensions, prefabricate HDPE condensate drains based on surveyed dimensions, install condensate drains on the landfill gas header, connect condensate drain to leachate manholes, and abandon two (2) existing condensate drains and remove one (1) existing condensate drain.
Posted Date
Aug 3, 2025
Due Date
Feb 3, 2026
Release: Aug 3, 2025
Close: Feb 3, 2026
Work includes, but is not limited to, survey and excavation of existing gas headers to determine invert elevation and dimensions, prefabricate HDPE condensate drains based on surveyed dimensions, install condensate drains on the landfill gas header, connect condensate drain to leachate manholes, and abandon two (2) existing condensate drains and remove one (1) existing condensate drain.
Repair Steam and Condensate Risers Building 1 - Phase 2 (CON). Replace existing radiators, install new steam and condensate risers and connect them to existing steam lines, steam traps, and new radiators. s. Work includes all labor, management, equipment, materials, general construction, alterations, necessary removal and replacement of radiators, install new steam and condensate risers, connect condensate risers to existing steam lines, steam traps and new radiators. The work also includes cap and seal old steam and condensate risers, install new insulation on the steam and condensate risers and connect lines to existing steam traps and radiators, all electrical work, controls integration, and ducting, landscaping and floor repairs as necessary to do the work at various locations in Building Perform all work within a confined space not readily accessible to maintenance staff. See attached file.
Posted Date
Jan 21, 2026
Due Date
Mar 19, 2026
Release: Jan 21, 2026
Work includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Work includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair Steam and Condensate Risers Building 1 - Phase 2 (CON). Replace existing radiators, install new steam and condensate risers and connect them to existing steam lines, steam traps, and new radiators. s. Work includes all labor, management, equipment, materials, general construction, alterations, necessary removal and replacement of radiators, install new steam and condensate risers, connect condensate risers to existing steam lines, steam traps and new radiators. The work also includes cap and seal old steam and condensate risers, install new insulation on the steam and condensate risers and connect lines to existing steam traps and radiators, all electrical work, controls integration, and ducting, landscaping and floor repairs as necessary to do the work at various locations in Building Perform all work within a confined space not readily accessible to maintenance staff. See attached file.
Available