Cherry Island Landfill and Pigeon Point Landfill Manhole Rehabilitation - Phase 2 RFP
Posted
Nov 2, 2026
Dec 15, 2026
Work includes mobilization and demobilization, surface preparations of each manhole for lining, which include but is not limited to, surface cleaning, removal of large debris, removal of existing liner, infiltration inspection, grouting, and rinsing; temporary bypass pumping and hauling, replacement of six (6) manhole cones, odor control, and lining of each manhole and pump station using one of the approved epoxy coating material and testing.