Summary
Construction of a concrete box beam bridge includes grading, drainage, and paving. Work also includes 12,705 CY of road & drainage excavation (unclassified); 13,755 TON of borrow excavation (graded solid rock); 488 CY of placing and spreading topsoil; 709 CY of furnishing & spreading topsoil; 307 CY of sediment removal; 5,501 LF of temporary silt fence (with backing); 1,420 LF of turbidity curtain(description) (epsc stage 2a & 2b); 8,660 TON of mineral aggregate, type a base, grading d; 219 TON of mineral aggregate, type b base, grading (description) (d); 3,179 TON of mineral aggregate (size 57); 84 LF of 34"x 22" horizontal oval concrete pipe culvert; 58 LF of 18" pipe culvert (side drain); 3,166 SF of concrete driveway; 175 LF of plastic pavement marking (24" barrier line); 201 LF of plastic pavement marking (8" dotted line). See attached file.