Summary
Work consists of grading, drainage, and paving, includes 59 LF of removal of pipe; 7,524 CY of road & drainage excavation (unclassified); 1,406 CY of placing and spreading topsoil; 27 CY of undercutting; 51 CY of sediment removal; 160 LF of temporary silt fence (with backing); 1,515 LF of temporary silt fence (without backing); 3,600 TON of mineral aggregate, type a base, grading d; 100 TON of mineral aggregate, type b base, grading (description) (c or d); 516 TON of asp. Conc. Mix(pg70-22) (bpmb-hm) gr. A-s; 2,380 LF of saw cutting asphalt pavement; 68 LF of 18" concrete pipe culvert (class iii); 106 LF of 24" pipe culvert (side drain); 500 LF of removal and reset fence; 760 LF of high-visibility construction fence; 300 LF of plastic pavement marking (8" dotted line); 57 SF of plastic pavement marking (yield line); 8,685 SY of sodding (new sod). See attached files.