Summary
Work consists of widening of road, including bridges, retaining walls, signals, lighting, and paving. Includes 9 LF of removal of pipe (size ,sta. ) (8"); 132 LF of removal of pipe (size ,sta. ) (48" x 30"); 342 SY of removal of rigid pavement, sidewalk, etc. ; 16,491 SY of removal of asphalt pavement; 136,616 CY of road & drainage excavation (unclassified); 132,885 TON of borrow excavation (graded solid rock); 42,697 CY of borrow excavation (unclassified); 2,724 LF of 18" temporary slope drain; 2,584 CY of sediment removal; 36,651 LF of temporary silt fence (without backing); 168,267 TON of mineral aggregate, type a base, grading d; 285 SF of retaining wall; 1,410 LF of painted pavement marking (stop line); 75 LF of plastic pavement marking (transverse shoulder), see attached file.