Summary
Work consists of grading, drainage, construction of concrete box beam bridges, retaining wall, and paving. Work also includes 69 LF of removal of pipe (description) (18"); 328 SY of removal of rigid pavement, sidewalk, etc; 104 CY of removal of rigid pavement; 269 LF of removal of curb and gutter; 773 CY of road & drainage excavation (unclassified); 1,059 CY of borrow excavation (unclassified); adjustment of existing catchbasin; 102 TON of cold planing bituminous pavement; 1,459 SF of concrete sidewalk (4"); 634 SF of signs (construction); 14,090 LF of removal of pavement marking (line); 52 LF of removal of pavement marking (stop line); 442 TON of mineral aggregate, type a base, grading d; 102 TON of cold planing bituminous pavement; see attached file.