Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct 8' high chain link industrial/commercial security fencing at the substation pole yard with manual and motor-operated vehicle swing gates. All material will be supplied by the owner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply and install approx. 200 LF of 6' High security aluminum picket fencing and one (1) approx. 30' of 6' high sliding gate with track and locking mechanism around the perimeter of the Cultural Center yard/parking area.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Supply and install approx. 200 LF of 6' High security aluminum picket fencing and one (1) approx. 30' of 6' high sliding gate with track and locking mechanism around the perimeter of the Cultural Center yard/parking area.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of structural and electrical equipment necessary to support the construction and operation of a fully functional electrical substation.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Work includes installation of structural and electrical equipment necessary to support the construction and operation of a fully functional electrical substation.
AvailableThe Fort Valley Utility Commission (UCFV) is requesting sealed bids for construction of two tubular metal pole barn structures at the Upper Yard (500 Anthoine St, Fort Valley, GA). The solicitation specifies dimensions, wind‑load design to 135 mph, a 10‑year minimum materials warranty, a pre‑bid meeting on Jan 21, 2026 at 10:00 am, and a bid opening on Jan 29, 2026 at 10:00 am. Bids must be submitted in sealed envelopes to the Utility Commission by the stated bid opening time and the procurement will follow applicable local and state requirements.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
The Fort Valley Utility Commission (UCFV) is requesting sealed bids for construction of two tubular metal pole barn structures at the Upper Yard (500 Anthoine St, Fort Valley, GA). The solicitation specifies dimensions, wind‑load design to 135 mph, a 10‑year minimum materials warranty, a pre‑bid meeting on Jan 21, 2026 at 10:00 am, and a bid opening on Jan 29, 2026 at 10:00 am. Bids must be submitted in sealed envelopes to the Utility Commission by the stated bid opening time and the procurement will follow applicable local and state requirements.
AvailableWork includes repair and replacement of concrete surfaces within four (4) recreation yards to address potential trip hazards and ensure a safe environment. Work also includes the demolition and reconstruction of these recreation yards as needed. Additionally, repairs to the perimeter interior security fencing will be performed to address potential security concerns. The scope further includes paving over the green area surrounding the horizon building and installing underground conduit to support future installation of light poles.
Posted Date
Jul 24, 2025
Due Date
Jan 15, 2026
Release: Jul 24, 2025
Close: Jan 15, 2026
Work includes repair and replacement of concrete surfaces within four (4) recreation yards to address potential trip hazards and ensure a safe environment. Work also includes the demolition and reconstruction of these recreation yards as needed. Additionally, repairs to the perimeter interior security fencing will be performed to address potential security concerns. The scope further includes paving over the green area surrounding the horizon building and installing underground conduit to support future installation of light poles.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →