Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Request for Proposal (CSP/RFP 26-005) is issued by the City of College Station for the Post Oak Substation Yard Expansion. The solicitation was issued on December 29, 2025, with a mandatory pre-proposal meeting on January 15, 2026, and bids are due by January 29, 2026. This is a construction project requiring attendance at a mandatory pre-proposal meeting for proposal submission.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Goose Creek Consolidated Independent School District (GCCISD) issued CSP #26-005 to procure maintenance, repair, and services for detention ponds located within the district. The work includes inspections, vegetation management, sediment removal, erosion control, debris removal, and repairs to ensure stormwater functionality and compliance. Responses must be submitted through the district’s online bidding portal and small, minority, and women-owned businesses are encouraged to respond.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Goose Creek Consolidated Independent School District (GCCISD) issued CSP #26-005 to procure maintenance, repair, and services for detention ponds located within the district. The work includes inspections, vegetation management, sediment removal, erosion control, debris removal, and repairs to ensure stormwater functionality and compliance. Responses must be submitted through the district’s online bidding portal and small, minority, and women-owned businesses are encouraged to respond.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
AvailableThe Community College of Baltimore County is soliciting proposals for a full-service advertising agency to provide integrated marketing and advertising services including market research, creative development, media planning/buying, campaign launch and optimization for a three-year term with two one-year renewal options. The solicitation (RFP 26-005-H, BPM054676) opened on 2025-12-23, has questions due by 2026-01-20, and closes on 2026-03-26; procurement contact is Brandy Henry (bhenry2@ccbcmd.edu). The agency must have at least five years’ experience and demonstrate experience with higher education or similarly complex organizations; official solicitation documents are posted on the buyer’s eMMA posting.
Posted Date
Dec 23, 2025
Due Date
Mar 26, 2026
Release: Dec 23, 2025
Close: Mar 26, 2026
The Community College of Baltimore County is soliciting proposals for a full-service advertising agency to provide integrated marketing and advertising services including market research, creative development, media planning/buying, campaign launch and optimization for a three-year term with two one-year renewal options. The solicitation (RFP 26-005-H, BPM054676) opened on 2025-12-23, has questions due by 2026-01-20, and closes on 2026-03-26; procurement contact is Brandy Henry (bhenry2@ccbcmd.edu). The agency must have at least five years’ experience and demonstrate experience with higher education or similarly complex organizations; official solicitation documents are posted on the buyer’s eMMA posting.
AvailableWork includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →