CountyNV
Posted
Oct 13, 2026
Nov 10, 2026
Cottonwood Avenue Ponding Mitigation and Sim Street Improvement RFP
Work includes ponding mitigation and street improvement.
Description: Work includes unclassified excavation, 100 LF temporary silt fence, 20 CY temporary rock filter dam, solid slab sod, 2700 SY 8" type a aggregate base, 2700 SY subgrade method b, 2400 SY 6" dowel jointed concrete pavement, 1500 LF 6" integral c, 280 SY 4" concrete sidewalk, 565 SY 6" concrete driveway, 8 EA type a modified wheelchair ramp. See attached file.
City · OK, US
From the first pre-RFP signals to the published RFP and its files.
Budget
72 days before RFP
The FY2026-27 budget records reconstruction of Queens Avenue from 14th Street to 715 feet east as a fiscal-year objective.
Fiscal 2027 Objectives: Complete new sidewalk construction along the north side of Hartford Avenue from NE Woodland Road to Pecan Road and on the east side of Pecan Road from Hartford Avenue to Mockingbird Drive. Reconstruct alley south of 200 E. Grand Avenue. Reconstruct portions of Central Avenue from Waverly Street to Franklin Street. This is first…
City of Ponca City, Oklahoma FY2026-27 Budget
Budget · Jul 1, 2026
Board meeting
32 days before RFP
The Ponca City Board of Commissioners approved authorization to advertise bids for the Queens Avenue street-improvement project, Project No. SST 27-1.
**CONSENT AGENDA** Board of Commission found items #3 through #9 non-controversial and routine in nature. MOTION MADE BY: Bowers to approve consent agenda. MOTION SECONDED BY: Bodick. AYES NAYS ABSTAIN Mayor Wagner X Commissioner Austin Commissioner Bodick X Commissioner Bowers X Commissioner Newcomb X 3. Consider And Vote Upon The Minutes Of The Ponca City…
RFP published
Proposals due (3 days left)
Ponca City Board of Commissioners and Ponca City Utility Authority Regular Meeting Minutes
Board meeting · Aug 10, 2026
Decision makers connected to this RFP from City of Ponca City.
Adjacent opportunities open for bidding right now.
CountyNV
Posted
Oct 13, 2026
Nov 10, 2026
Work includes ponding mitigation and street improvement.
CityKS
Posted
Oct 27, 2026
Nov 18, 2026
Project includes asphalt pavement improvements, curb & gutter, entrance surfacing, and grading. The project also includes a hot mix asphalt (HMA) overlay, milling, rock edge wedge, pavement markings, and traffic control.
CityCA
Posted
-
Dec 10, 2026
Work consists of generally involves removal of approx 2,310 LF of 18" diameter vitrified clay pipe (VCP) and replacement with 21" diameter VCP sewer main, removal of approx 2,580 LF of 21" diameter VCP and replacement with 30" diameter VCP sewer main, installment of approx 300 LF of 30" diameter VCP sewer main, and abandonment of approx 300 LF of 21" diameter VCP sewer main. This project also includes the removal and replacement of existing sanitary sewer manholes, abandonment of existing sanitary sewer manholes, and reconnection and/or reconstruction of active sanitary sewer laterals.
CityCA
Posted
Oct 28, 2026
Nov 18, 2026
Scope of work: excavation, grading, removal & replacement of asphalt concrete pavement and portland cement concrete curb ramps, sidewalk, curb and gutter, and ribbon gutter.