Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide design, operating, financing and/or construction services for the scott's & phillip's additions low-pressure sewer system and storm sewer replacement.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
Provide design, operating, financing and/or construction services for the scott's & phillip's additions low-pressure sewer system and storm sewer replacement.
AvailableThis work generally consists of excavation of a sinkhole, removal and replacement of an existing drainage manhole, removal and replacement of associated storm sewer piping, backfill with Controlled Low-Strength Material (CLSM), asphalt pavement restoration, sidewalk restoration, and traffic control as needed.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
This work generally consists of excavation of a sinkhole, removal and replacement of an existing drainage manhole, removal and replacement of associated storm sewer piping, backfill with Controlled Low-Strength Material (CLSM), asphalt pavement restoration, sidewalk restoration, and traffic control as needed.
Availablework includes rehabilitation of approx 6,700 LF of 8" sanitary sewer line by cured-in-place-pipe and pipe bursting methods, rehabilitation of 61 manholes using geopolymer liner, and the removal and replacement of approx 800 LF of storm sewer pipes, including all other associated improvements.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
work includes rehabilitation of approx 6,700 LF of 8" sanitary sewer line by cured-in-place-pipe and pipe bursting methods, rehabilitation of 61 manholes using geopolymer liner, and the removal and replacement of approx 800 LF of storm sewer pipes, including all other associated improvements.
AvailablePrepare storm sewer segments for lining with a cure in place liner (CIPL). Preparation includes labor and equipment and supplies required for cleaning segments as needed for ensuring proper bonding of liner to storm sewer pipe, diversion of storm water in system as needed to maintain proper street drainage of area, removal of backflow valve, and other task required for preparing system for lining. Line the identified segments of the storm sewer main line with CIPL. Includes all labor, equipment and supplies (including liner), needed to line approx., 550' of storm sewer, opening of liner and cutting out lateral intakes, sealing of ends of lined segments and cutouts. Post installation video inspection to verify completion and sealing requirements are met. Includes all labor, equipment, and video data processing and deliverable. Fluid/sediment waste handling and disposal from storm sewer cleaning and lining as applicable. Fluid and sediments removed during cleaning are to be considered petroleum contaminated. Includes all labor, equipment, transportation, and disposal costs for removed fluids and sediments during preparation of the storm sewer and if applicable fluid waste generated during lining procedure.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Prepare storm sewer segments for lining with a cure in place liner (CIPL). Preparation includes labor and equipment and supplies required for cleaning segments as needed for ensuring proper bonding of liner to storm sewer pipe, diversion of storm water in system as needed to maintain proper street drainage of area, removal of backflow valve, and other task required for preparing system for lining. Line the identified segments of the storm sewer main line with CIPL. Includes all labor, equipment and supplies (including liner), needed to line approx., 550' of storm sewer, opening of liner and cutting out lateral intakes, sealing of ends of lined segments and cutouts. Post installation video inspection to verify completion and sealing requirements are met. Includes all labor, equipment, and video data processing and deliverable. Fluid/sediment waste handling and disposal from storm sewer cleaning and lining as applicable. Fluid and sediments removed during cleaning are to be considered petroleum contaminated. Includes all labor, equipment, transportation, and disposal costs for removed fluids and sediments during preparation of the storm sewer and if applicable fluid waste generated during lining procedure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →