Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
East Plantation Utility District (Montgomery County, Texas) is soliciting bids for rehabilitation of approximately 6,700 LF of 8‑inch sanitary sewer by CIPP and pipe bursting, rehabilitation of 61 manholes using a geopolymer liner, and removal and replacement of approximately 800 LF of storm sewer. A pre‑bid conference is scheduled for January 8, 2026, at 10:00 AM at Bleyl Engineering’s Conroe office. Bids are due January 15, 2026, at 2:00 PM CST, with documents available on CivCast.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sanitary sewer rehabilitation includes 11,092 LF 8" diameter cipp liner; 4,829 LF 10" diameter cipp liner; 4,520 LF 12" diameter cipp liner; 426 ea sewer service reinstatement. See attached files.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Sanitary sewer rehabilitation includes 11,092 LF 8" diameter cipp liner; 4,829 LF 10" diameter cipp liner; 4,520 LF 12" diameter cipp liner; 426 ea sewer service reinstatement. See attached files.
AvailableThe proposed construction consists of 532 LF of sanitary sewer replacement, sanitary sewer lining of approx 6,030 LF of pipe ranging in size from 12" to 21" diameter, sanitary sewer manhole rehabilitation, including 3 cover replacements, 5 manhole replacements, 18 internal chimney seals, and other miscellaneous items of work.
Posted Date
Nov 25, 2025
Due Date
Jan 6, 2026
Release: Nov 25, 2025
Close: Jan 6, 2026
The proposed construction consists of 532 LF of sanitary sewer replacement, sanitary sewer lining of approx 6,030 LF of pipe ranging in size from 12" to 21" diameter, sanitary sewer manhole rehabilitation, including 3 cover replacements, 5 manhole replacements, 18 internal chimney seals, and other miscellaneous items of work.
AvailableThis project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Remedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
Posted Date
-
Due Date
Jun 27, 2027
Close: Jun 27, 2027
Remedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Close: Jan 8, 2026
This project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
Available