Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Prepare storm sewer segments for lining with a cure in place liner (CIPL). Preparation includes labor and equipment and supplies required for cleaning segments as needed for ensuring proper bonding of liner to storm sewer pipe, diversion of storm water in system as needed to maintain proper street drainage of area, removal of backflow valve, and other task required for preparing system for lining. Line the identified segments of the storm sewer main line with CIPL. Includes all labor, equipment and supplies (including liner), needed to line approx., 550' of storm sewer, opening of liner and cutting out lateral intakes, sealing of ends of lined segments and cutouts. Post installation video inspection to verify completion and sealing requirements are met. Includes all labor, equipment, and video data processing and deliverable. Fluid/sediment waste handling and disposal from storm sewer cleaning and lining as applicable. Fluid and sediments removed during cleaning are to be considered petroleum contaminated. Includes all labor, equipment, transportation, and disposal costs for removed fluids and sediments during preparation of the storm sewer and if applicable fluid waste generated during lining procedure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes approx. of 305 LFT of 8 " Sewer Pipe lining , 610 LFT of 10" of Sewer Pipe lining ,25 EACH of sewer latera; protruding lead cutting.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Project includes approx. of 305 LFT of 8 " Sewer Pipe lining , 610 LFT of 10" of Sewer Pipe lining ,25 EACH of sewer latera; protruding lead cutting.
AvailableThe City of Edwardsville is soliciting contractors to perform sewer lining services (cleaning, inspection, and cured-in-place pipe lining/CIPP) as part of its 2025 sewer lining contract. Bids are to be submitted to the City Clerk by the published closing date and related bid documents are available from the City via the plan-holders form.
Posted Date
Nov 21, 2025
Due Date
Jan 9, 2026
Release: Nov 21, 2025
Close: Jan 9, 2026
The City of Edwardsville is soliciting contractors to perform sewer lining services (cleaning, inspection, and cured-in-place pipe lining/CIPP) as part of its 2025 sewer lining contract. Bids are to be submitted to the City Clerk by the published closing date and related bid documents are available from the City via the plan-holders form.
AvailableWork consists of new storm sewer construction, storm sewer repairs, CIPP lining, and manhole and inlet construction & rehabilitation.
Posted Date
Dec 8, 2025
Due Date
Dec 31, 2025
Release: Dec 8, 2025
Close: Dec 31, 2025
Work consists of new storm sewer construction, storm sewer repairs, CIPP lining, and manhole and inlet construction & rehabilitation.
AvailableThe City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
The City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis