Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This work generally consists of excavation of a sinkhole, removal and replacement of an existing drainage manhole, removal and replacement of associated storm sewer piping, backfill with Controlled Low-Strength Material (CLSM), asphalt pavement restoration, sidewalk restoration, and traffic control as needed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Emergency and on-call services for storm sewer and roadway repairs.
Posted Date
Dec 13, 2025
Due Date
Jan 21, 2026
Release: Dec 13, 2025
Close: Jan 21, 2026
Emergency and on-call services for storm sewer and roadway repairs.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
Posted Date
-
Due Date
Jun 27, 2027
Close: Jun 27, 2027
Remedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
AvailableWork consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Work consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
AvailableProvide mortimer work center storm damage repairs.
Posted Date
Jun 2, 2025
Due Date
Jul 1, 2026
Release: Jun 2, 2025
Close: Jul 1, 2026
Provide mortimer work center storm damage repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →