Downtown Alley Improvements (Invitation to Bid) *REBID*
project generally consists of storm drainage improvements, alley surface demolition, and brick paver installation. See attached file.
Description: Storm drain repair. Scope of work includes - 375 LF 15" RCP storm drain 1500D; 40 LF 12" RCP storm drain 1500D; 2 EA standard catch basin and local depression; 1 EA reinforced concrete collar; see attached file.
City · CA, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of Fullerton.
Adjacent opportunities open for bidding right now.
CityNC
-
Closes
Sep 3, 2026
project generally consists of storm drainage improvements, alley surface demolition, and brick paver installation. See attached file.
CityCA
Aug 6, 2026
Closes
Aug 27, 2026
The Town of Woodside is soliciting construction bids for the Alta Vista Alley Storm Drain Improvements Project, with an engineer’s estimate of $220,000–$240,000. The bid was published on August 6, 2026, and is open until August 27, 2026, at 2:00 PM Pacific Time. The posting identifies bid set plans and project specifications as related documents.
CityCA
Aug 6, 2026
Closes
Aug 27, 2026
The Town of Woodside is soliciting construction bids for the Alta Vista Alley Storm Drain Improvements Project, with an engineer’s estimate of $220,000–$240,000. The bid was published on August 6, 2026, and is open until August 27, 2026, at 2:00 PM Pacific Time. The posting identifies bid set plans and project specifications as related documents.
CityUT
Aug 8, 2026
Closes
Aug 27, 2026
Work includes includes 1,430 LF of 18" RCP and 6 manholes; remove 3 storm manholes, cellular concrete fill old 6" storm pipe; remove and replace concrete flatwork; and sod landscape restoration; 100 SF of R/R 6" thick concrete flatwork; 3 EA of remove storm manhole/junction box; 25 CY of cellular concrete (LCC) fill in abandoned storm pipes; 1 EA of 72" manhole; 5 EA of 48" manhole; 70 LF of 12" sdr-35 PVC (white); 2 EA of 1" irrigation loop over storm; 1 EA of 2" water lateral loop under storm; 500 ton of sewer rock astm size no. 4; 22,500 SF of6oz non woven geotextile fabric; 1,000 TON of APWA 3" minus granular borrow; 14,600 SF of 6" thick topsoil & sod landscape restoration; 10 HR of tree root cutting.