CityFL
Posted
Aug 6, 2026
Sep 30, 2026
Storm Pump Station Repair and Maintenance Services
Storm Pump Station Repair and Maintenance Services.
Description: Work consist of 55 cy of plug and fill existing storm drain pipes with slurry grout, cofferdam installation, 5 ea of storm drain manholes with frame and cover, 327 lf of 21" dia rcp storm drain pipe (class v) on crushed rock bedding wrapped in geotextile fabric, 118 lf of 24" dia rcp storm drain pipe (class v) on crushed rock bedding wrapped in geotextile fabric, 560 lf of 30" dia rcp storm drain pipe (class v) on crushed rock bedding wrapped in geotextile fabric, 92 lf of 36" dia rcp storm drain pipe (class v) on crushed rock bedding wrapped in geotextile fabric. See attached file.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityFL
Posted
Aug 6, 2026
Sep 30, 2026
Storm Pump Station Repair and Maintenance Services.
CountySC
Posted
Sep 1, 2026
Oct 1, 2026
Anderson County is seeking bids for the Hembree Creek Pump Station Replacement, Bid #27-004. A pre-bid meeting is scheduled for September 15, 2026, at 8:30 a.m., and questions are due by 5:00 p.m. on September 17, 2026. Bids are due October 1, 2026, at 11:00 a.m., and solicitation documents may be obtained by contacting allpurchasing@andersoncountysc.gov.
Maryland Department of Planning
State AgencyMD
Posted
Sep 1, 2026
Sep 30, 2026
The Maryland Department of Planning - Administration is soliciting bids for repairs to the septic pump station near the MAC Lab at Jefferson Patterson Park & Museum, 10505 Mackall Road, St. Leonard, Maryland. The work includes all labor, materials, equipment, inspection, replacement of damaged components, and compliance with health and safety requirements, with preference for Certified Small Business and Veteran-Owned Small Business Enterprises. Attendance at the mandatory pre-bid meeting on September 15, 2026, at 9:00 a.m. is required, and bids must be received by 3:00 p.m. on September 30, 2026.
Hampton Roads Sanitation District
Special DistrictVA
Posted
-
Oct 20, 2026
Construction project involves replacement of a pump station with two 25-HP submersible solids handling pumps, a natural gas bypass pump, 720 LF of 10" HDPE force main, culvert replacement, manhole rehabilitations, and demolition of existing pump station.
Decision makers connected to this RFP from San Francisco International Airport.