Terminal 3 West Modernization - TP 173- East Exterior Wall
Aug 21, 2026
Closes
Sep 14, 2026
The San Francisco Airport (Construction) procurement portal lists this open trade-package solicitation (Project ID: 10071.76 - TP 173) for the East Exterior Wall of the Terminal 3 West Modernization project, making it a construction procurement rather than a grant program. Turner Construction Company is identified as the design-builder and is seeking to prequalify a subcontractor for design, engineering, preconstruction, and construction services. The scope includes metal stud framing, plaster, metal panels, glazing, and skylights, while structural demolition is by others; the estimated cost is $20 M and the CMD LBE participation requirement is 5%, with the portal displaying times in Pacific Time (Los Angeles).