Open RFP

Sterling 9+1 Bay VSF RFP

Description: Work includes construction of a new 9+1-bay Vehicle Storage Facility (VSF) in an existing CDOT maintenance yard. The new VSF shall be a 10,000 gross square foot pre-engineered metal building (PEMB). The VSF will contain an administration bay with mezzanine and nine 20’-0” x 50’-0” bays used to store CDOT plow trucks, two of which shall be wash bays with waterproofed finishes and fixtures. The flooring shall be concrete slab-on-grade with a 20-foot concrete apron at the overhead doors.

Buyer
Released
Oct 27, 2026
Closes
Dec 3, 2026(35 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts