Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Intersection improvements for the South 9th Street and Washington Street intersection, including expansion to 5-lanes, new sidewalks, ADA-compliant curb ramps, traffic signals, pavement striping, signing, milling, and full depth asphalt construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Intersection improvements to expand the street to 5-lanes in each direction including two through lanes in each direction and a left-turn lane on each leg of the intersection. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection and new traffic signals will be installed. In addition, new pavement striping and signing will be installed. The project also includes milling and overlaying of existing asphalt with new full depth asphalt construction for widening of the intersection.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Intersection improvements to expand the street to 5-lanes in each direction including two through lanes in each direction and a left-turn lane on each leg of the intersection. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection and new traffic signals will be installed. In addition, new pavement striping and signing will be installed. The project also includes milling and overlaying of existing asphalt with new full depth asphalt construction for widening of the intersection.
AvailableCR 214 (King Street) and N Volusia Street Intersection Improvements
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
CR 214 (King Street) and N Volusia Street Intersection Improvements
AvailableIn general, the work includes furnishing all labor, materials, and equipment necessary for the installation of approx. 13,655 LF of 6" PVC watermain; 3,940 LF of 8" PVC watermain; 1,275 LF of 10" PVC watermain; 3,165 LF of 10" non potable watermain, 1" service connections; meter installations and connections to onsite plumbing at each residence as shown on the plans, back flow preventers, fire hydrant services and installation of hydrants and abandonment of existing water mains. The new watermains will connect to the existing water distribution system at multiple connection points as shown on the plans. In addition, the work includes furnishing all labor, materials, and equipment necessary to complete improvements to 9th street. This includes the reconstruction of a new asphalt concrete section between the intersections of 9th street & LAS Palmas Avenue and 9th street & Sperry Avenue, curb ramps at the intersection of e street and LAS palmas along 9th street, new concrete drive approaches and associated concrete sidewalk improvements and aggregate base swales. Utility improvements consist of adjusting existing utility boxes and structures within 9th street to grade. Signage and striping improvements consist of new centerline striping along 9th street, stop bars and crosswalk striping and the relocation of existing signage outside the proposed improvements.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
In general, the work includes furnishing all labor, materials, and equipment necessary for the installation of approx. 13,655 LF of 6" PVC watermain; 3,940 LF of 8" PVC watermain; 1,275 LF of 10" PVC watermain; 3,165 LF of 10" non potable watermain, 1" service connections; meter installations and connections to onsite plumbing at each residence as shown on the plans, back flow preventers, fire hydrant services and installation of hydrants and abandonment of existing water mains. The new watermains will connect to the existing water distribution system at multiple connection points as shown on the plans. In addition, the work includes furnishing all labor, materials, and equipment necessary to complete improvements to 9th street. This includes the reconstruction of a new asphalt concrete section between the intersections of 9th street & LAS Palmas Avenue and 9th street & Sperry Avenue, curb ramps at the intersection of e street and LAS palmas along 9th street, new concrete drive approaches and associated concrete sidewalk improvements and aggregate base swales. Utility improvements consist of adjusting existing utility boxes and structures within 9th street to grade. Signage and striping improvements consist of new centerline striping along 9th street, stop bars and crosswalk striping and the relocation of existing signage outside the proposed improvements.
AvailableRealignment of street, drainage, curb ramps, sidewalks, curbing, paving, and other miscellaneous road work.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Realignment of street, drainage, curb ramps, sidewalks, curbing, paving, and other miscellaneous road work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis