Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the work includes furnishing all labor, materials, and equipment necessary for the installation of approx. 13,655 LF of 6" PVC watermain; 3,940 LF of 8" PVC watermain; 1,275 LF of 10" PVC watermain; 3,165 LF of 10" non potable watermain, 1" service connections; meter installations and connections to onsite plumbing at each residence as shown on the plans, back flow preventers, fire hydrant services and installation of hydrants and abandonment of existing water mains. The new watermains will connect to the existing water distribution system at multiple connection points as shown on the plans. In addition, the work includes furnishing all labor, materials, and equipment necessary to complete improvements to 9th street. This includes the reconstruction of a new asphalt concrete section between the intersections of 9th street & LAS Palmas Avenue and 9th street & Sperry Avenue, curb ramps at the intersection of e street and LAS palmas along 9th street, new concrete drive approaches and associated concrete sidewalk improvements and aggregate base swales. Utility improvements consist of adjusting existing utility boxes and structures within 9th street to grade. Signage and striping improvements consist of new centerline striping along 9th street, stop bars and crosswalk striping and the relocation of existing signage outside the proposed improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes waterline replacement
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes waterline replacement
AvailableThis project includes replacing 374 feet of existing waterline with 16" ductile iron waterline in a 26" steel casing under us 30/250.
Posted Date
Dec 23, 2025
Due Date
Jan 22, 2026
Release: Dec 23, 2025
Close: Jan 22, 2026
This project includes replacing 374 feet of existing waterline with 16" ductile iron waterline in a 26" steel casing under us 30/250.
AvailableContract for asphalt repairs for waterline replacement projects & street maintenance.
Posted Date
Nov 8, 2025
Due Date
Jan 13, 2026
Release: Nov 8, 2025
Close: Jan 13, 2026
Contract for asphalt repairs for waterline replacement projects & street maintenance.
AvailableAsphalt repairs for waterline replacement projects & street maintenance - utilities department.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Asphalt repairs for waterline replacement projects & street maintenance - utilities department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis