CityFL
Posted
Sep 4, 2026
Oct 14, 2026
SRF Area P-11 Improvements
The project involves the replacement of approx 5,962 LF of road, 14,601 LF of water line, 4,953 LF of sewer line, and 5,579 LF of sewer lining.
Description: The City of Panama City is requesting bids for PC26-037 SRF Area P-12 Improvements, a construction project in the Cove neighborhood. The work includes replacing approximately 15,916 linear feet of road, 15,216 linear feet of water line, and 4,705 linear feet of sewer line, plus lining 7,731 linear feet of sewer; the expected project duration is 365 days. Bids must be submitted electronically by November 6, 2026, at 11:00 a.m. Central Time.
City · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Posted
Sep 4, 2026
Oct 14, 2026
The project involves the replacement of approx 5,962 LF of road, 14,601 LF of water line, 4,953 LF of sewer line, and 5,579 LF of sewer lining.
CountyNC
Posted
-
Oct 22, 2026
The Project includes but is not limited to the following Work: Sewer pump station to include at a minimum all Labor, Tools, Equipment, Materials and Supplies for the complete construction of One (1) 80 GPM Wastewater Duplex Pumping Station. Electrical installation of all equipment including automatic transfer switch and tie-in to permanent backup generator. Telemetry for level indication, pump temperature and moisture switches, and other required alarming features. Work includes approx 34,900 LF 4" SDR-21 PVC force main; 1,160 LF 4" DI force main; 390 LF 8" steel casing; 2,490 LF 4" HDPE; 2,490 LF 4" DI via directional boring.
CityNE
Posted
Oct 6, 2026
Nov 5, 2026
Construction of a box culvert for the extension of burlington street and removal/replacement of the existing trail. The sanitary sewer improvements include realignment of the sewer main and removal of the existing siphon across ralston creek. The realignment starts at the southwest corner of the united seed property and then follows the burlington road row/paving to 72nd street. A temporary aerial crossing of the creek is included in the project. group b: 2025 burlington street extension and 75th street improvements include removal and replacement of burlington street from 76th to 75th street and then new paving and alignment from 75th to 72nd streets. The work on 75th street includes removal of the existing street and replacement with the addition of on-street parking. Along both streets streetscape, lighting, sidewalks and storm sewer are included.
Rhode Island Airport Corporation
Special DistrictRI
Posted
Oct 8, 2026
Oct 14, 2026
Work consists of the comprehensive renovation and rehabilitation of an existing storage space and an existing second floor space that is accessed from within the storage space. Work includes selective demolition and removal of existing equipment, finishes, mechanical systems, doors, windows and other building components; installation and modification of fire alarm, electrical, HVAC, plumbing, lighting, and low voltage systems, as well as associated architectural, structural, and exterior building work required to complete the renovation
Decision makers connected to this RFP from City of Panama City.