Culvert Repair Project On Sr 613 N of the Railroad Tracks
Work includes culvert repair. work includes the insertion and grouting of a liner pipe inside the culvert and repairing the embankment & replacing the guardrail. ODOT D1's hydraulic engineer has run calculations that show a 54" liner pipe with improved inlet would work hydraulically, the item 707.85 steel reinf. Thermoplastic ribbed liner pipe is approved by ODOT's Office of Hydraulic Engineering. The guardrail must also be disposed of and replaced. The site must be restored to its original condition.