D265813 Culvert Replacement RFP
Culvert replacement project.
Description: Project includes 770 CY roadway excavation; 13,200 SF dry seed; 13,200 SF rolled erosion control product; 90 TN hot mix asphalt; 250 SY place hot mix asphalt; 1,080 LF 24" corrugated steel pipe; 160 LF 36" corrugated steel pipe; 570 LF abandon culvert; 91 LF 18" cured-in-place pipeliner; 89 LF 24" cured-in-place pipeliner; 50 LF reconstruct guardrail. See attached file.
StateAgency · CA, US
Adjacent opportunities open for bidding right now.
New York State Department of Transportation
State AgencyNY
Posted
-
Nov 12, 2026
Culvert replacement project.
CityWI
Posted
Oct 31, 2026
Dec 3, 2026
Work includes consists of the removal of an existing bridge structure and culverts and construction of a 13'-7" x 4'-7" x 43'-6" long full invert aluminum box culvert with aluminum headwalls and wingwalls, backfilling, slope grading, erosion control, roadway excavation, asphalt paving, restoration, and associated work.
CountyIN
Posted
-
Nov 10, 2026
Replacement of 15x9' CMP arch culvert with 16'10" x 8'3" aluminum box structure.
CityNY
Posted
Oct 29, 2026
Nov 19, 2026
In general, the project consists of installing 64 LF of precast concrete box culvert with a 20' span and a 10' rise. Work includes temporary and permanent traffic control devices and signage, site clearing and grubbing, temporary stream bypassing, culvert pipe materials and associated assembly hardware, cast in place concrete wing and headwalls, stream restoration, stone fill, guiderail, general lawn/site restoration, and restoration of the roadway asphalt pavement.
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
125 days before RFP
Caltrans' proposed FY2026-27 budget estimated $6,988,995,000 in RMRA resources for distribution, including deferred maintenance and rehabilitation of the state highway system.
Road Maintenance and Rehabilitation Account (3290) The Road Maintenance and Rehabilitation Account (RMRA) was created as part of the Road Repair and Accountability Act of 2017, also known as SB 1. Pursuant to SB 1, the RMRA receives revenues attributable to increased fuel taxes, a portion of TIF and the Road Improvement Fee (Zero-Emission Vehicles). The…
California Department of Transportation FY2026-27 Proposed Budget
Proposed budget · Jun 30, 2026
Budget
124 days before RFP
The FY2026-27 State Budget describes the Capital Outlay Projects Program as funding repair projects in the State Highway Operations and Protection Program.
1835019 - CAPITAL OUTLAY PROJECTS The Capital Outlay Projects Program funds capacity projects in the State Transportation Improvement Program and repair projects in the State Highway Operations and Protection Program. Projects are programmed by Caltrans and funding is
California Department of Transportation FY2026-27 Budget
Budget · Jul 1, 2026
RFP published
Proposals due (32 days left)
Decision makers connected to this RFP from California Department of Transportation.