Open RFP

SR-530 & Smokey Point Blvd Roundabout RFP

Description: Construction of a single lane roundabout at the intersection of State Route 530 (SR-530) and Smokey Point Blvd. Elements of the project also include the installation of stormwater facilities, pedestrian and roadway illumination systems and rapid rectangular flashing beacons (RRFBs), new water and sewer facilities, sidewalks, hardscape buffer strips, and landscaping includes 1,810 LF ductile iron pipe for water main 12" diam., 280 LF steel casing, 1,470 LF testing storm sewer pipe, 780 LF 12" ductile iron stormwater pipe, 1,772 LF conduit pipe 4" diam., 24 LF detectable directonal strip, 1,480 LF testing storm sewer pipe, 1,252 LF PVC sanitary sewer pipe 12" diam., 6 EA manhole 48" diam. type 1.

Buyer
City of Arlington

City · WA, US

Released
Oct 22, 2026
Closes
Nov 10, 2026(16 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts