Retrieving RFP details
Release
Close
City of Aurora
Scope of Work (SOW) includes the complete removal of the existing netting and the installation of new replacement nets. The new netting system will be installed at a higher elevation than the original to better accommodate current operational needs and enhance functionality of the space. All work shall be performed in accordance with the specifications provided and coordinated architectural and structural requirements.
Suny Tompkins Cortland Community College
Provide removal and installation of the drainage system on the entire (east) side of the fieldhouse. Work shall also include washing the cmu and concrete wall, installing a watertight membrane and protection board below grade. Backfilling with drainage stone, hauling any spoils, repointing of all failed mortar joints with mortar that matches as close as possible and sealing the cmu wall.
City of Mercedes
Provide recreation center roof replacement project.
Suny Binghamton University
To purchase an outfield netting system for the university softball field. Specifications are as follows: 40 FT straight pole ball safety netting system - including poles, cabling, hardware, ground sleeves and caps. 198 FT.
Release
Oct 21, 2025
Close
Nov 12, 2025