Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will create a 2.1 MW DC (1.4 MW AC) maximum solar canopy adjacent to the WWTP to offset a portion of current energy usage at a WWTP. The design must include a minimum of 13ft elevation of the panels due to floodplain concerns and the Respondent’s submittal should include, but is not limited to: major milestones schedule, including provisions for: permitting & licensing, as applicable; engineering, procurement, and construction; testing strategy. Proposed strategy for adding additional solar generation and extensibility. List of major equipment supplies proposed to be utilized for project development. Supply chain risk mitigation strategy.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide power generation CMMS replacement.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Provide power generation CMMS replacement.
AvailablePower generation and microgrid.
Posted Date
Nov 27, 2025
Due Date
Jan 13, 2026
Release: Nov 27, 2025
Close: Jan 13, 2026
Power generation and microgrid.
AvailableQualified providers to provide electric to be generated by a solar photovoltaic power system ("PV System") to be installed at various schools.
Posted Date
Nov 19, 2025
Due Date
Jan 13, 2026
Release: Nov 19, 2025
Close: Jan 13, 2026
Qualified providers to provide electric to be generated by a solar photovoltaic power system ("PV System") to be installed at various schools.
AvailablePower generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
Posted Date
Sep 29, 2025
Due Date
Feb 18, 2026
Release: Sep 29, 2025
Close: Feb 18, 2026
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis