Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
U.S. Army Engineer District New England
The U.S. Army Corps of Engineers, New England District issued a Sources Sought to determine interest and capability for clearing trees (>3" DBH) from approximately 1 acre of inclined rock face below Thayer Hall at West Point. Work must be performed from the toe of the rock face (top access is blocked by a building) and felled trees removed and hauled offsite; operations are restricted to the period 2026-11-01 through 2027-03-30. This notice is a market survey with responses due June 26, 2026, with an estimated work value between $150,000 and $450,000.
Posted Date
Jun 12, 2026
Due Date
Jun 26, 2026
Release: Jun 12, 2026
U.S. Army Engineer District New England
Close: Jun 26, 2026
The U.S. Army Corps of Engineers, New England District issued a Sources Sought to determine interest and capability for clearing trees (>3" DBH) from approximately 1 acre of inclined rock face below Thayer Hall at West Point. Work must be performed from the toe of the rock face (top access is blocked by a building) and felled trees removed and hauled offsite; operations are restricted to the period 2026-11-01 through 2027-03-30. This notice is a market survey with responses due June 26, 2026, with an estimated work value between $150,000 and $450,000.
AvailableU.S. Army Engineer District New England
Construct new public water supply well.
Posted Date
Jun 3, 2026
Due Date
Jul 3, 2026
Release: Jun 3, 2026
U.S. Army Engineer District New England
Close: Jul 3, 2026
Construct new public water supply well.
AvailableU.S. Army Engineer District New England
The specific work includes installing a steel sheet pile wall with concrete cap at the edge of the water to act as a new retaining wall in two areas of the site: an approx. 75 F length of sheet in the vicinity of the WYC club house and an approximate 150 F length at the eastern limits of the site. The steel sheets shall be installed on the water side of the existing block retaining wall which shall remain in place. The area between the existing block retaining wall and the new sheet pile wall shall be filled and compacted with gravel. Additional work includes installing new wire fencing, removing and reinstalling exterior electric lighting and receptacles, and other related items.
Posted Date
Jun 2, 2026
Due Date
Jul 1, 2026
Release: Jun 2, 2026
U.S. Army Engineer District New England
Close: Jul 1, 2026
The specific work includes installing a steel sheet pile wall with concrete cap at the edge of the water to act as a new retaining wall in two areas of the site: an approx. 75 F length of sheet in the vicinity of the WYC club house and an approximate 150 F length at the eastern limits of the site. The steel sheets shall be installed on the water side of the existing block retaining wall which shall remain in place. The area between the existing block retaining wall and the new sheet pile wall shall be filled and compacted with gravel. Additional work includes installing new wire fencing, removing and reinstalling exterior electric lighting and receptacles, and other related items.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge