Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kansas Department of Administration
Power generation and microgrid.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District New England
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
Posted Date
Sep 29, 2025
Due Date
Dec 19, 2025
Release: Sep 29, 2025
U.S. Army Engineer District New England
Close: Dec 19, 2025
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Great Lakes and Ohio River Division
Diesel centralized generators;information and communication systems; installation and commissioning of microgrid systems; installation of necessary breakers and switchgear; installation of photovoltaic systems installation of centralized generation to provide power to multiple buildings with controls installation of electrical and telecommunication duct bank and controls for microgrids implementation of control systems for electrical peak shaving.
Posted Date
Oct 30, 2025
Due Date
Dec 8, 2025
Release: Oct 30, 2025
Great Lakes and Ohio River Division
Close: Dec 8, 2025
Diesel centralized generators;information and communication systems; installation and commissioning of microgrid systems; installation of necessary breakers and switchgear; installation of photovoltaic systems installation of centralized generation to provide power to multiple buildings with controls installation of electrical and telecommunication duct bank and controls for microgrids implementation of control systems for electrical peak shaving.
U.S. Army Engineering and Support Center, Huntsville
This is a Sources Sought notice issued by the U.S. Army Corps of Engineers, Huntsville Engineering and Support Center to identify qualified Korean Architect-Engineer (A-E) firms capable of providing design and related services for a smart microgrid and backup power system at Camp Walker, Republic of Korea. The work includes development of a 100% Design-Bid-Build package for PV solar arrays, diesel generators, a 6,000KW/3,000KWh battery energy storage system, microgrid controls, structural upgrades, commissioning, cybersecurity and permitting, and coordination with Korea Electric Power Corporation. Responses are limited to Korean A-E firms and are for market research only (not a solicitation); submissions are due by 12 December 2025.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
U.S. Army Engineering and Support Center, Huntsville
Close: Dec 12, 2025
This is a Sources Sought notice issued by the U.S. Army Corps of Engineers, Huntsville Engineering and Support Center to identify qualified Korean Architect-Engineer (A-E) firms capable of providing design and related services for a smart microgrid and backup power system at Camp Walker, Republic of Korea. The work includes development of a 100% Design-Bid-Build package for PV solar arrays, diesel generators, a 6,000KW/3,000KWh battery energy storage system, microgrid controls, structural upgrades, commissioning, cybersecurity and permitting, and coordination with Korea Electric Power Corporation. Responses are limited to Korean A-E firms and are for market research only (not a solicitation); submissions are due by 12 December 2025.
AvailableNAVFAC Mid-Atlantic
Provide Design-build (DB), Replace Backup Power Generation.
Posted Date
Apr 23, 2025
Due Date
Jan 15, 2026
Release: Apr 23, 2025
NAVFAC Mid-Atlantic
Close: Jan 15, 2026
Provide Design-build (DB), Replace Backup Power Generation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →