Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Great Lakes and Ohio River Division
Diesel centralized generators;information and communication systems; installation and commissioning of microgrid systems; installation of necessary breakers and switchgear; installation of photovoltaic systems installation of centralized generation to provide power to multiple buildings with controls installation of electrical and telecommunication duct bank and controls for microgrids implementation of control systems for electrical peak shaving.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
U.S. Army Engineer District Louisville
The USACE Louisville District issued a Sources Sought (market survey) to identify interested small business concerns for a design/bid/build installation-level microgrid at Fort Buchanan, Puerto Rico, including twelve 570 kW diesel generators, a ~2.5 MWh/4 MW BESS, fuel storage and polishing systems, microgrid controls, interconnection, and integration with existing PV and wind. The sources sought requests contractor qualifications, past similar projects (no more than three), bonding information, and small business status; responses will inform acquisition strategy but do not constitute a solicitation for award. Responses are requested by Dec 8, 2025 at 2:00 PM Eastern and should be emailed to henry.c.caldera@usace.army.mil.
Posted Date
Oct 30, 2025
Due Date
Dec 8, 2025
Release: Oct 30, 2025
U.S. Army Engineer District Louisville
Close: Dec 8, 2025
The USACE Louisville District issued a Sources Sought (market survey) to identify interested small business concerns for a design/bid/build installation-level microgrid at Fort Buchanan, Puerto Rico, including twelve 570 kW diesel generators, a ~2.5 MWh/4 MW BESS, fuel storage and polishing systems, microgrid controls, interconnection, and integration with existing PV and wind. The sources sought requests contractor qualifications, past similar projects (no more than three), bonding information, and small business status; responses will inform acquisition strategy but do not constitute a solicitation for award. Responses are requested by Dec 8, 2025 at 2:00 PM Eastern and should be emailed to henry.c.caldera@usace.army.mil.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kansas Department of Administration
Power generation and microgrid.
Posted Date
Nov 27, 2025
Due Date
Jan 13, 2026
Release: Nov 27, 2025
Kansas Department of Administration
Close: Jan 13, 2026
Power generation and microgrid.
AvailableU.S. Army Engineer District New England
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
Posted Date
Sep 29, 2025
Due Date
Dec 19, 2025
Release: Sep 29, 2025
U.S. Army Engineer District New England
Close: Dec 19, 2025
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
AvailableCalifornia Department of Parks and Recreation
Repair the existing microgrid system. The project includes the demolition of existing solar panels, inverters, battery bank, and associated appurtenances. The project also includes providing, installing, and testing new solar panels, inverters, automatic transfer switch, battery banks, and reconnection to existing electrical system, including backup generator.
Posted Date
Oct 9, 2025
Due Date
Dec 10, 2025
Release: Oct 9, 2025
California Department of Parks and Recreation
Close: Dec 10, 2025
Repair the existing microgrid system. The project includes the demolition of existing solar panels, inverters, battery bank, and associated appurtenances. The project also includes providing, installing, and testing new solar panels, inverters, automatic transfer switch, battery banks, and reconnection to existing electrical system, including backup generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →