Jonathan Alder Local School District
School DistrictOH
Posted
Sep 22, 2026
Oct 5, 2026
BAS Controls Upgrade RFP
BAS controls upgrade includes upgrade controls throughout the building using: Distech controllers; EC-net (Niagara framework) software; upgrade front end graphics (using existing field devices).
