Closing soon

Smith Street Road Construction 1. Concrete Road Widening / Parking Area

Description: Remove failed pavement and unsuitable material as necessary. Prepare and compact subgrade. No aggregate base required unless necessary due to unsuitable subgrade. Place 6" 4,000 psi concrete, finished for positive drainage and tied into existing roadway and curb/gutter. Provide appropriate joints and reinforcement. Estimated quantity: 975 sy. 2. Concrete curb & gutter install 6" curb with 24" gutter, 4,000 psi concrete. Prepare and compact subgrade. Base rock only where necessary. Estimated quantity: 290 LF. 3. Concrete sidewalk construct 5' wide x 4" thick, 4,000 psi concrete sidewalk. Prepare and compact subgrade. Estimated quantity: 130 LF. 4. Culvert & storm box remove existing culvert. Install approximately 60 LF of 18" HDPE pipe. Backfill and compact. Construct new 6" concrete storm box floor/walls and install 6" precast concrete lid.

Buyer
City of Sturgeon

City · MO, US

Released
Sep 23, 2026
Closes
Oct 9, 2026(7 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts