CountyFL
Posted
Aug 19, 2026
Oct 22, 2026
Woodbine Road North Widening Project
Work includes 1,032 SY removal of existing concrete; 16 EA mailboxes, f&i single; 92,308 CY regular excavation; 5,312 CY subsoil excavation; 60,920 CY type b stabilization; 930 SY optional base group 1; 25,580 SY milling existing asphalt pavement 1" average depth; 13,050 tn superpave asphaltic conc, traffic c, pg 76-22; 3,400 tn asphaltic conc, fc-9. 5, traffic c, pg 76-22; 180 CY concrete class ns, gravity wall index 400-0-11; 44 CY concrete class iv, culverts; 3 CY conc class v mass - substructure; 5,037 lb reinforcing steel-roadway. See outside link.
